3D airport terminal to be built in Bengaluru by 2021

Image result for bengaluru airport sets record t2 to be built with 3d tech

Neighbourhood Technology Desk\ Garima Kotroo: Bengaluru is going to set a new benchmark, an intelligent 3D design technology will be used to build the Terminal 2 of Kempegowda International Airport. Authorities have already decided on Autodesk BIM 360 to be the design platform. It will be built in phases, with Phase-1 covering 2,55,000 sqmts. The Rs. 4,000cr project is expected to be operational by 2021.

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s